DESIGN SYSTEM · v0.1

One exhibit grammar carries the whole publication

Palette, type, pull-quote, exhibit header, and the reusable exhibits below. Green, Orange and Purple carry meaning and never decorate; nothing on the site asks the reader to act. Anything marked OWNER TO REPLACE is a placeholder, not data.

Palette: three teal surfaces, three status accents

Black
#000000
Metric ink only
Deep Teal 01
#002E38
Masthead, section openers, body text
Deep Teal 02
#004651
Chart series 2, hover
Deep Teal 03
#005C68
Chart series 3, captions
Light Teal 01
#81C0C4
Chart series 4, rules
Light Teal 02
#ABD5D8
Placeholder border, dividers
Light Teal 03
#DAE9EB
Page background, table stripe
Green
#00FFA4
On track · Go · Target met
Orange
#FFA96E
At risk · Decision required
Purple
#865FFF
New since last edition

Type: headings state the takeaway, never the topic

Sora 600 · 34/1.2
Wave 1 needs three engineers the team does not have
Sora 600 · 22/1.3
Section heading: the answer, in one line
Source Sans 3 · 17/1.5
Body copy is a humanist sans at 17px on a measure of roughly 70 characters. Every sentence states something the organization knows or is doing.
IBM Plex Mono · metrics
12,400 msg/h
Don't
Capacity Analysis

Editorial elements: pull-quote, exhibit header, theme chip, status dot

“We are not missing capability. We are missing connection.”

Jim Hansen, Chief Product Officer
EXHIBIT 3
Action title states the finding, not the topic
Source: owning team · As of September 2026
SIMPLIFY STRENGTHEN ACCELERATE
Met or ahead Behind or at risk New this edition No baseline yet
OWNER TO REPLACE · placeholder marker
KPI figure · Cycle time
days
Target · Prior edition
OWNER TO REPLACE · sparkline illustrative

Stage-gate diagram and stage ladder

1 · Intake
2 · Design Review
3 · Estimation
4 · Build
5 · Quality Gate
6 · Release Approval
Gate: Prioritization Owner
Gate: Innovation
Gate: Delivery
Gate: —
Gate: one Definition-of-Done
Gate: Executive Sponsor
Today
— msg/h · — %
Avangrid Expansion
— msg/h · — %
SMUD
— msg/h · — %
Evergy Endpoint
— msg/h · — %

Multi-lane roadmap with dependency arrows

Q1
Q2
Q3
Q4
Feature Waves
Wave 1
Wave 2
Infrastructure
Temporal cluster
Second region
Enterprise Services
Service 1 exposure
Dashed borders: dates OWNER TO REPLACE. Dashed arrows: cross-lane dependencies. Rendered static; scrolls horizontally on narrow widths.

2×2 prioritization matrix and heat map

PS-to-ARR Impact →
F1
F2
F3
F4
DO FIRST
DEFER
Adoption Impact → · bubble = effort
Temporal
Superset
LJ DSL
MT security
Utility
Backend
Frontend
Data
QA
Coveragenone → deepOWNER TO REPLACE

RACI matrix and grouped standard (reference table)

DECISIONPRIO. OWNERPRODUCTINNOVATIONDELIVERYEXEC
Feature intakeARCCI
PrioritizationA/RCCCI
Scope changeARCCI
Release go/no-goCCCRA
Assignments illustrative · OWNER TO REPLACE
ITEMVERIFICATIONSIGN-OFF
Security and Multi-Tenancy
Tenant isolation verifiedAutomated testDelivery
Auth scopes reviewedPeer reviewInnovation
Performance
Load test at stage targetLoad run reportDelivery

Architecture diagram frame

Client channels
avail — %
Temporal orchestration
avail — %
Broker cluster · SMS
added this stage
— msg/h— msg/h
Every arrow carries measured msg/h; every component carries measured availability. Purple outline = added or scaled versus prior stage (new this edition).